

Reg D 506(c) — Accredited Investors Only
Bitcoin Mining Powered by Natural Gas
A Reg D 506(c) offering to raise $2.5M for the deployment of 14 low-cost, high-efficiency bitcoin mining containers powered by stranded natural gas. Converting unused energy into daily crypto income.

$2.5M
Total Raise
14
Mining Units
10%
Preferred Return
$175K
Per Container
Rise Natural Blockchain Fund 1
Stranded gas, put to work at the wellhead.
All across Texas, there are oil wells producing natural gas with no real way to sell it. No pipeline, no market, just stranded gas going to waste.
For years, operators have been turning that gas into money by running generators, producing electricity, and mining Bitcoin right at the source. We've always liked the model, but never liked how much capital the big guys needed just to get started.
So, we did it differently.
We've identified the right locations, secured gas agreements at low cost, and partnered with a team that's been building these units for years, at prices well below market. That saves us time, money, and lets us scale faster.
Now we're bringing the opportunity to you.
Texas Operations
Strategic locations with stranded gas access
Low-Cost Energy
Powered by otherwise wasted natural gas
Expert Team
Years of experience building mining units
Scalable Model
Efficient deployment for rapid growth
The Process
How it works
A vertically integrated model that converts unused energy into daily crypto income.
Wellhead to wallet — six stages, one continuous loop, all on site.
- 01
Gas Extraction
Gas comes off the well
- 02
Power Generation
Powers an onsite generator
- 03
Mining Operations
Electricity runs Bitcoin miners in mobile containers
- 04
Secure Storage
Bitcoin is sent to the Fund's secure wallet
- 05
Operating Costs
Operating expenses are paid
- 06
Profit Distribution
Remaining profit is distributed to the fund
Rise Natural Blockchain
From build to payout — the deployment lifecycle
Step 01
Order & Build
A container is fabricated, racked with miners, and wired as a complete plug-and-play unit.
Step 02
Deploy to Gas Site
The finished unit is transported and set in place at a wellhead with stranded gas available.
Step 03
Generator Hook-Up
A CAT natural gas generator is staged, connected to the wellhead supply, and tied in.
Step 04
Config & Testing
Miners are pointed, tuned, and load-tested against cooling and exhaust before continuous run.
Step 05
24/7 Monitoring
Hashrate, temperature, and uptime are monitored around the clock, with bitcoin routed to the fund wallet.
Step 06
Monthly Operations
Operating expenses are reconciled each month, with proceeds distributed per the fund agreement.
In The Field
Hardware on the ground in Texas



Specifications
Each Mining Container Includes
Fourteen identical units, each engineered around the same power, cooling, and safety envelope.
- Mining Units
- 81 Antminer S19
- Generator
- CAT Natural Gas (min. 300 kW)
- Estimated Draw
- 3.5 kW per miner (~283.5 kW load)
- Gas Usage
- ~400,000 BTU/hr (~0.4 MCF/hr)
- Cooling System
- Integrated cooling & exhaust
- Safety
- Fire suppression systems
Get In Touch
Contact us for more information
5120 Woodway Dr. Ste. 10010, Houston, TX 77056
